Vietnam · Malting

Intermalt malting heat recovery

GEA reports that the heat pump upgrades cooling-plant waste heat for malt kilning and estimates about 2,000 tonnes of annual CO2 savings. The public case does not provide a complete measured COP boundary.

Operational

Recorded project facts

Supplier or system
GEA
Published capacity
Not publicly stated
Heat source
Cooling-plant waste heat
Heat sink
Kilning air
Refrigerant
Not publicly stated
Evidence type
Manufacturer report

Evidence boundary

The linked source was published by a supplier involved in the project. It can establish the supplier's stated scope and figures but is not independent verification of annual performance.

Values have not been normalised across projects because source temperatures, sink temperatures, system boundaries and reporting periods differ.

Evidence source

GEA Intermalt customer case

Record reviewed 21 August 2026. Status is shown separately so a planned system cannot be mistaken for an operating installation.

Open evidence source →